SCOPE OF WORKS: 

We carried out 3 phases at the Abbey centre, the first phase included an instu carpark, columns, beams and slabs.  Phase two was the erection of a steel building including ground beams, pile caps and floor slabs.  The third phase was the erection of the new food court, medical clinic and the toilet block at the abbey centre using instu slab, metal deck slab, ground beams, pile caps and bolt settings. 

 

We supplied the concrete, rebar and formwork to all the three number phases along with the engineering.

LOCATION: 
Newtownabbey, N. Ireland